THE REAL TEST ON THE BRIDGE ON THE MOVING LOADS
THE REAL TEST ON THE BRIDGE ON THE MOVING LOADS

THE REAL TEST ON THE BRIDGE ON THE MOVING LOADS

Authors:  

Apsemetov M.Ch.

Cand. Sci. (Eng.), Professor of the “Highways, bridges and tunnels” Department, Kyrgyz State Technical University named after I.  Razzakov. Bishkek, Kyrgyz Republiс


Ulanbek T. Shekerbekov

Cand. Sci. (Eng.), associate professor of the Department “Highways, bridges and tunnels” Department, Kyrgyz State Technical University named after I. Razzakov. Bishkek, Republiс of Kyrgyzstan   

shekerbekov_@ut@mail.ru


Kurmanbek uulu Nurlan
Cand. Sci. (Eng.), associate professor of the “Highways, bridges and tunnels” Department of Kyrgyz State University of Construction, Transport and Architecture named after N. Isanov. Bishkek, Republic of Kyrgyzstan 


Rubric:     Theoretical and experimental studies   
Annotation:
In this article deals with the test of the bridge on the moving load. Testing was conducted to determine the carrying capacity of the bridge for transportation on the impeller bridge for Kambar-Ata-2, with a total weight with trailer and towing vehicle 129 m. To solve this purpose visual inspection of the bridge were carried out, the bridge static test and the dynamic test the bridge. We obtain limit points for superstructures are more than moments of calculation, testing and carried excessive loads. According to the results of tests on the bridge transported excess load, the impeller for the Kambar-Ata-2 total weight of 129 tons.

Возврат к списку